Site directory
A to Z
Contact us
Home
About
News and events
Environmental monitoring
Environmental management
Resource consents
Plans and publications
Buses
Site directory
Search
Civil Defence
Search
Resource consents
About resource consents
Do I need a resource consent?
Applying for a resource consent
Fees and charges
Application forms
Consultation
Assessing environmental effects
Notification
Submissions
Hearings
Appeals and objections
After consent is granted
Compliance and enforcement
Open for submission
Holcim (New Zealand Ltd) Recommending Reports
Meridian Energy Ltd Decision
Home
>
Resource consents
>
Holcim (New Zealand Ltd) Recommending Reports
Holcim (New Zealand) Ltd Information
Final Decision
Interim Decision on Joint Publicly Notified Applications
Interim Decision
ORC Air Conditions
ORC Water Conditions - Part A
ORC Water Conditions - Part B
ORC Water Conditions - Part C
WDC Conditions
WDC All Condition Figures
ORC Recommending Report and Appendices
Recommending Report
Overview
Part A - Ngapara Coal Pit Site
Part B - Windsor Sand Pit Site
Part C - Weston Limestone - Siltstone & Tuff Quarry Site
Part D - Main Plant Site
Statutory Considerations
Recommendations and Draft Consents
Appendices
Appendix 1 - Air (3.81mb)
Appendix 2 - Geochemical, Stormwater and Geotechnical Issues (1.19mb)
Appendix 3 - Groundwater
Appendix 4 - Surface Water
Appendix 5 - Natural Hazards
Appendix 6 - Photos of Watercourses
WDC Recommending report and Annexures
Recommending Report
Holcim WDC Section 42A (Main Report) August 2007
Annexures
Annexure A (1) of Holcim WDC Section 42A Report (Conditions) August 2007
Annexure A (2) of Holcim WDC Section 42A Report (Appendix 1 to conditions aerial overlay) August 2007
Annexure B of Holcim WDC Section 42A Report (Site Location Map) August 2007
Annexure C of Holcim WDC Section 42A (Preface of 1979 Report) August 2007
Annexure D of Holcim WDC Section 42A Report (Summary of submission issues) August 2007
Annexure E of Holcim WDC Section 42A Report (Whitstone SNF aerial overlay) August 2007
Annexure F (1) of Holcim WDC Section 42A Report (status table) August 2007
Annexure F (2) of Holcim WDC Section 42A Report (Legal Advice 1 ) August 2007
Annexure F (3) of Holcim Section 42A Report (Legal Advice 2 ) August 20071
Annexure G of Holcim WDC Section 42A Report (Policy) Final August 2007
Annexure H (1) of the Holcim Section 42A Report (Written Approvals - Weston) August 2007 (2.81mb)
Annexure H (2) of the Holcim Section 42 A Report (Written Approvals - Ngapara) August 2007
Annexure H (3) of the Holcim Section 42A Report (Written Approvals - Windsor) August 2007
Annexure I (1) of Holcim WDC Section 42A Report (Peer Review Economics) August 2007
Annexure J of Holcim WDC Section 42A Report (Peer Review Landscapes) August 2007
Annexure K (1) of Holcim WDC Section 42A Report (Peer Review of Transport) August 2007
Annexure K (Map) of Holcim Section 42A Report (Peer Review of Transport - map) August 2007
Annexure L of Holcim Section 42A Report (Peer Review of Noise) August 2007
WDC Further Information
Request for Information on Light Spillage 13 July 2007
Final Lighting Response 24 July 2007
Letter re Response to S92 Request 10 August 2007
Related info
Powered by
Viatx Content
, an
e-Media
application
Otago Regional Council
Telephone: 03 474 0827 Fax: 03 479 0015
70 Stafford Street, Private Bag 1954, Dunedin 9054