View this email in your browser

HEAD OF LAKE WAKATIPU


COMMUNITY UPDATE 13 | NOVEMBER 2021

Kia ora koutou. We are coming to you today with an update on a new river flow monitor for the Rees River, progress on the Glenorchy liquefaction and flood hazard studies, and an invitation to ORC’s Land and Water Plan consultation for the Upper Lakes rohe.
 
What’s happening now?
 
  • Rees River flow monitoring
    The Department of Conservation have now granted ORC approval to install a river flow monitoring station in the Rees River near Invincible. We are planning to have this installed and operational by the end of 2021. We will let you know once it's up and running. Water flow data will be available in real-time on our WaterInfo website for anyone to access.

    Alongside water level monitoring stations at the Glenorchy Lagoon (installed October 2020) and at the Glenorchy boat ramp (installed January 2021), these three recent additions to ORC’s monitoring network will now give a much better record of river flows and levels in this area. This is important because it will enable us to better understand and model flood hazards in more detail, and to provide improved flood warning and response.
     
  • Glenorchy liquefaction study
    We have now completed the field work using 19 cone penetrometer tests (CPT) and four boreholes. Thanks to the residents of Glenorchy for your patience while this work took place! The new geological data obtained from these tests are now being analysed. Once finished, we will share this information with you (expected late this year).
Drilling being undertaken along Oban Street (October 2021).
Drilling being undertaken along Oban Street (October 2021).
  • Flood hazard study
    In October, our hydrologists and consultant had a site visit to Glenorchy and Rees-Dart rivers. We are now progressing the hydraulic modelling and flood hazard assessment.  The flood hazard study is expected to be completed by December 2021.
     
  • River inspections
    We have been carrying out our annual inspections of Otago’s rivers. In late-September, our Engineering team flew over the Dart and Rees Rivers to see how they have changed over the past year. Photo records like this provide us with a snapshot of the rivers at the time, and over time, helps us see how the rivers migrate and change over time.
Flyover view of Dart and Rees Rivers (September 2021).
Flyover view of Dart and Rees Rivers (September 2021).
 

Land and Water Plan consultation


ORC is developing a new Land and Water Plan in partnership with Kāi Tahu, including specific rules and limits on water and land use in your area.

Our Policy and Science teams will be in the Upper Lakes rohe (an area that includes Glenorchy) in November and we’d love to hear what you want for land and waterways in your area. Please come and tell us at the community meeting on 17 November, 12.30-2pm or 7-8.30pm, Queenstown Events Centre, Frankton. You are welcome to drop-in prior to, or between these meeting times to talk to staff and councillors. You will be able to give feedback at the meeting or after the meeting online at www.orc.govt.nz/UpperLakes.
 

Head of Lake Wakatipu newsletter sign-up

 

We have created a sign-up portal on the ORC website so you never miss out on our monthly newsletters. Archives of past newsletters can also be found here under the Newsletter archives tab.

 

Contacts

 

If you have any questions or would like to get in touch with us, please email us at customerservices@orc.govt.nz or call 0800 474 082.

Twitter
Facebook
Website
 
Copyright © 2026 Otago Regional Council, All rights reserved.
You have opted to be on the mailing list for our e-newsletter.

Our mailing address is:
Otago Regional Council
70 Stafford Street
Private Bag 1954
Dunedin, Otago 9054
New Zealand

Add us to your address book


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.