Kia ora koutou. This month, we are talking about a new study on the Buckler Burn alluvial fan, and updates on the two ongoing hazards studies.
Glenorchy township is situated on an alluvial fan deposited by the Buckler Burn.
A physical geography team from Massey University are currently investigating the natural processes that formed Buckler Burn alluvial fan. They are looking in detail at the sedimentary deposits in drill cores from the ongoing Glenorchy liquefaction study to do this. This investigation will help us better understand the potential alluvial fan hazards of the area such as flooding and debris deposition.
If the team finds any organic material that can be age-dated, they could also tell us the timing of events in the deposition of those sediments.
Interestingly, a previous research project1 has estimated that Lake Wakatipu stabilised at its current height relatively recently (in geological terms), about 500 years ago. The near-surface sediments in this area may also be relatively young.
[1] A study by Simon Cook, Sam McColl and Tim Stahl, 2013. Surveying and Dating Post-Glacial Lake Shorelines in New Zealand. Royal Institution of Chartered surveyors (RICS).

Investigations and analysis from the cone penetrometer tests* (CPTs) and boreholes in Oban, Coll, Islay and Mull Streets are progressing well. We are aiming to finalise the findings to share with you all in early 2022.
Read more about this study of Glenorchy's liquefaction risks here.
General information about earthquakes can also be found here.
*Cone penetrometer tests are used to check whether soil layers are likely to liquefy under different levels of earthquake shaking.

We are progressing the hydraulic modelling and flood hazard assessment.
We have now run a model to simulate the February 2020 flood event, and the modelled floodwater coverage has matched well with observations of the flood extent in Glenorchy – a good test of the model accuracy.
Next, we will model other scenarios with different river flows and lake levels, and to see what flood characteristics might look like if there was an outbreak from the Rees River.

Read the last month's update on this study here.
In our last newsletter, we wrote about installing a new river flow monitoring station in the Rees River near Invincible. We are planning to have this installed and operational by the end of 2021. We will let you know once it's up and running. Water flow data will be available in real-time on our WaterInfo website for anyone to access.

If you are currently not receiving our monthly newsletters, you can sign up here and view archives of past editions.
If you have any questions or would like to get in touch with us, please email us at headofthelake@orc.govt.nz.

Copyright (C) 2021, Otago Regional Council. All rights reserved.