Our freshwater fishes must be able to move freely in habitats to feed, migrate, spawn, and complete their life cycle. Instream structures, like culverts, weirs, and dams, can create barriers that block these fish from moving freely.

Ensuring proper fish passage protects our native biodiversity and keeps our waterways connected. All culverts, weirs and flap gates must meet minimum environmental conditions for fish passage and may need a resource consent.

While the new regulations do not apply to instream structures installed before 3 September 2020, it is still important to ensure those structures provide for fish passage. There are options for remediating or retrofitting structures to help fish passage.

The New Zealand Fish Passage Guidelines set out how to design instream structures that allow for fish passage.

Under national and regional rules, the installation, alteration, maintenance, and removal of some structures is a permitted activity – and therefore does not require resource consent – only if you can meet the specific requirements outlined below.

New vs Existing Structures

Fish passage requirements for structures installed on or after 3 September 2020 are generally managed differently from structures that already existed before September 2020.

This distinction exists because many older culverts, weirs, flap gates, and stream crossings were installed before modern fish passage requirements existed. Across Otago and the rest of New Zealand, many of these structures now create barriers that affect fish movement and freshwater habitat connectivity.

Current freshwater management frameworks generally focus on:

  • preventing new barriers from being created through fish-friendly design requirements for new structures; and

  • progressively improving existing barriers over time where practical and achievable.

New Structures

Key points:

  • Fish passage should be considered early during project design.
  • Poorly designed structures can create long-term barriers.
  • Fish-friendly design is often easier and cheaper to incorporate during initial construction.
  • Early planning can help avoid future compliance and remediation costs.

Structures installed on or after 3 September 2020 are generally managed as new structures under the NES-F and should be designed and installed in a way that allows fish and other aquatic species to move naturally through waterways.

Under current freshwater management frameworks, many new structures are expected to incorporate fish-friendly design principles from the outset. This helps prevent new fish passage barriers from being created and reduces the need for future remediation works.

Existing Structures

Key Points

  • Existing barriers are often prioritised based on ecological benefit and practicality.

  • Small remediation works can sometimes significantly improve fish passage.

  • Maintenance issues such as debris build-up and scour can also create barriers.

  • Not every existing structure requires immediate replacement.

Structures already existing before 3 September 2020, within Otago waterways, were installed before modern fish passage guidance and requirements existed. Some of these structures may now create barriers that affect fish movement and freshwater ecosystem health.

In many cases, existing barriers can be improved over time through remediation, maintenance, replacement, or small design changes that improve fish movement.

Fish-Friendly Design Principles

In many cases, fish-friendly structures are simply designed to allow water and fish to move through them as naturally as possible.

A good general rule is that a structure should aim to behave like a natural part of the stream rather than a barrier or artificial chute.

Fish passage issues often occur when structures:

  • create vertical drops;

  • increase water velocity;

  • reduce water depth; or

  • interrupt the natural stream bed.

Good fish-friendly design generally aims to:

  • maintain natural stream conditions;

  • maintain water depth;

  • reduce excessive water velocity; and

  • allow fish to move naturally upstream and downstream.

Incorporating fish passage into the initial design phase is often significantly easier and cheaper than retrofitting structures later.

For more detailed technical guidance, refer to the external resources below. 

Improving Existing Structures

Many existing fish passage barriers can be improved through removal, replacement, remediation measures, maintenance works, or upgrades.

Where a structure is no longer required, removal may provide the most effective fish passage outcome. Where a structure remains necessary, replacement with a fish-friendly alternative may be appropriate. In many other situations, existing fish passage barriers can be improved through relatively simple remediation measures, maintenance works, or upgrades.

In some situations, small changes such as reducing outlet drops, improving water depth, removing debris blockages, installing baffles, embedding culverts, or adding rock ramps can significantly improve fish passage outcomes.

The most appropriate remediation approach will depend on the structure type, stream characteristics, fish species present, surrounding habitat, and practical site constraints.

Regulations for instream structures

If you are installing, altering, or maintaining a structure in a waterway, you must comply with national and regional rules.

All new structures (installed after 3 September 2020) must meet standards for fish passage such as height, width, location and reporting conditions under the National Environmental Standards for Freshwater. If these standards cannot be met, a resource consent is required.

The installation, alteration, maintenance, and removal of some structures is a permitted activity – and therefore does not require resource consent – only if the specific requirements are met in regional and national regulations.

Rules

Information requirements

The information specified in the regulations must be collected and provided to the relevant regional council, together with the time and date of its collection, within 20 working days after the activity is finished.

Reporting back to us

When installing a structure in a waterway, you must provide information about the structure to us within 20 days of it being installed. Information must be provided for both permitted and consented activities.

Need help?

We have expert staff to provide localised assistance and advice regarding land management, consents and compliance. 

If you think you may require a resource consent, please contact us. We can arrange for you to have a free pre-application meeting.  