Lindsay Creek, in North East Valley, is surrounded by a vibrant urban population. This project helps develop understanding around the potential flood risk, improve preparedness and encourage awareness. 

Come to our event!

Wednesday, 21 October 2026
North East Valley Bowling Club

Drop-in Session: 3:00–6:00 pm (come anytime)

Community Presentation and Q&A: 6:30–7:30 pm

Stay for informal chats and refreshments until 8:30 pm

Lindsay Creek Flood Risk Reduction Programme

North East Valley has a long history of flooding, with significant flood events recorded since the 1860s, including in 1868, 1912, 1923, 1929, 1991, 2006 and 2015. Over the years, ORC has investigated flooding in the Lindsay Creek catchment and considered different approaches to managing flood risk.

You can learn more about the previous work done in the Lindsay Creek catchment in the timeline summary.

Today, ORC also carries out ongoing maintenance, monitoring, and flood forecasting to inform a flood response during heavy rainfall events.

The current Lindsay Creek Flood Risk Reduction Programme was launched in 2024 to take a fresh look at the problem.

  • The new 2026 flood hazard study gives ORC, DCC, emergency management agencies and the community better information about flooding from Lindsay Creek so we can work together to increase community resilience.

  • The next stage of investigation is to develop a Flood Risk Reduction Plan for the Lindsay Creek catchment. Past flood protection options will be re-examined, as well as a fresh look at new options. Future investment will be considered as part of ORC Long Term Plan (2027-37) deliberations.

There will be plenty of opportunities during this process for you to have your say.

What you need to know about Lindsay Creek flooding

Lindsay Creek rises on the flanks of Mount Cargill and runs southwest, draining North East Valley and joining the Water of Leith at the Botanic Garden. Most of the stormwater network in North East Valley discharges into Lindsay Creek. The catchment is compact (about 12 kilometres squared), with a short main channel (about 7 kilometres long). Some sections of Lindsay Creek channel are relatively narrow (sometimes only a few metres wide).

The steep and compact catchment results in the flood peak reaching urbanised areas quickly (less than two hours from the onset of heavy rain), leaving limited ability for residents and emergency services to plan a response during a heavy rainfall event.

During flood events, Lindsay Creek can overflow its channel and flood adjoining low-lying land. There is also a risk that the steep sider of the catchment may produce debris or landslides which may block the waterway and obstruct structures such as bridges and culverts.

During heavy rainfall events, high water levels in Lindsay Creek will prevent the free discharge of the stormwater network. Stormwater overflows contribute to surface flooding and can compound the effects of river flooding.

The flood history so far

2026 Lindsay Creek Flood Hazard Study

Why was this study completed?

The Lindsay Creek Flood Hazard Study provides a comprehensive update of existing information regarding the extent and severity of river flood hazards within the Lindsay Creek catchment and North East Valley. It refines our understanding of potential flood risks and provides updated detailed flood hazard information that can support Council and communities in making informed decisions and implementing effective floodplain management practices. This work will inform the flood risk reduction investigations and the emergency flood responses.

How was the flood hazard assessed?

The investigation used hydrological analysis and hydraulic modelling to improve understanding of the Lindsay Creek flood hazard. The investigation focused on river flooding, with some consideration of the influence of stormwater. It considered a range of flood flows, including the effects of a ‘maximum credible’ event and of climate change.

Flood hazard is assessed by considering the combined effects of floodwater depth and flow velocity, recognising that the severity of the hazard to people, vehicles, and structures is influenced by both the depth of inundation and the speed or velocity at which floodwaters are moving. While shallow, slow-moving water generally presents a lower hazard, increasing depths and velocities can increase the potential for instability, structural damage, and risk to life.

What does the new flood hazard information show?

During flood events, Lindsay Creek can overflow its channel and flood adjoining low-lying land in North East Valley. The extent of flooding and its characteristics vary with the size of flood event.

The effects of the 1% Annual Exceedance Probability (AEP) flood are shown and described in the following pages. The 1% AEP flood refers to a flood event that has a 1% chance of occurring in any given year, also known as a ‘100-year flood’.

  • Flooding in areas with the lowest flood hazard category (H1, see maps) is not likely to affect people’s safety, vehicle access and building structural stability because it is likely to be shallow and slow moving. However, flooding of buildings and internal damages and loss of property can still occur. This depends on the building floor level and local features, such as fences, affecting the overland flow paths locally.

  • Flooding on North Road (which is the main access to North East Valley) and multiple streets is likely to restrict the ability of people and emergency services to safely access parts of North East Valley (categories H2 and H3, see maps).

  • Most flooding identified in the new flood hazard investigation is unlikely to cause structural damage to buildings. The areas where the hazard categories are the highest (impact on building structural stability, categories H5 and H6) are within and adjacent to the creek channels and in local pockets of deeper or faster floodwaters along the North Road corridor, in particular in the vicinity of the intersection between North Road and Baldwin Street (see maps).

For a ‘maximum credible’ flood event, the floodwater is likely to affect larger parts of the areas between Bonnington Street and the North Road bridge and to start to affect properties along North Road from North Road Bridge to Opoho Road and the Botanic Gardens (mainly in the lower flood hazard category). Larger sections of North Road and many surrounding streets are likely to be impassable, possibly with more damage to North Road near the intersection with Baldwin Street.

Map2.3 Flood Hazard Rating North East Valley Flood Lindsay Creek Flood Hazard Study

Map 2.2 Flood Hazard Rating North East Valley Flood (Lindsay Creek) Flood Hazard Study (1)

Map 2.1 Flood Hazard Rating North East Valley Flood (Lindsay Creek) Flood Hazard Study (1)

Important limitations of the 2026 Lindsay Creek Flood Hazard Study

The report should be considered as one component of a broader flood risk assessment framework rather than a definitive statement of flood risk for any individual property. 

The results represent the predicted flood behaviour based on the available topographic, hydrological and hydraulic information, and the catchment conditions that existed at the time the study was undertaken. Flood hazard mapping should therefore be regarded as a representation of current conditions rather than a permanent depiction of flood hazard.

The investigation is primarily intended to inform the development of a flood risk reduction plan, and it is not intended or suitable to assess flood hazard for individual properties or for property insurance purposes.

Future changes to land use, development, stormwater infrastructure, channel conditions, climate, or the availability of improved datasets may influence flood behaviour and may mean revision of the mapping and associated hazard information.

The assessment does not include a detailed representation of the existing stormwater drainage network. 

All flood modelling is subject to uncertainty arising from assumptions relating to rainfall, hydrology, hydraulic model parameters, topographic data, channel conditions and future catchment changes.

How will the new information be used?

The updated flood hazard results will now help with:

  • improved understanding of potential flood risks for ORC, Dunedin City Council (DCC), emergency management agencies and the community

  • supporting ORC and communities in making informed decisions and implementing effective floodplain management practices

  • informing the ORC Lindsay Creek flood risk reduction programme

  • planning, risk awareness, and the development of strategies that promote responsible management of flood-prone areas.

Frequently Asked Questions

How can you get involved?

Otago Regional Council (ORC) is holding a community drop-in session and a presentation to:

  • share the key findings of the 2026 Lindsay Creek flood hazard study,

  • provide an update on the Lindsay Creek Flood Risk Reduction Programme and outline the next steps,

  • invite feedback on the flood hazard study, new flood information and next steps.

Staff from ORC and Civil Defence Emergency Management (CDEM) will be present at these sessions to hear your concerns or provide further information.

  • When: Wednesday, 21 October 2026

  • Where: North East Valley Bowling Club, 139 North Road, North East Valley

Drop-in Session

  • 3:00–6:00 pm

  • Come anytime, stay as long as you like

  • Explore detailed flood hazard maps

  • Chat (one-on-one or in a group) with staff from ORC and CDEM

Community Presentation and Q&A

  • 6:30–7:30 pm

Stay for informal chats and refreshments until 8.30pm

 

A section of the Lindsay Creek channel in North East Valley (looking upstream).
Note the narrowness of the channel, the steepness of the true right (vegetated) bank and the proximity of the houses and yards. (The concrete channel lining and floodwall are ORC assets.)